I brought some of the bits for a defender snorkel off evilbay in the week and started to fit it today.
Removed the wing and airbox fitted some flexible pipe and siliconed it in place then when it had gone off a bit gaffered the thing to within an inch of its life and refitted the airbox drilled the wing fed the tubing through and refitted the wing.
Cut the defender back plate to size and shape and re drilled the fixing holes then ran out of useable daylight.
Next comes the tricky bit finding time to fix the upright tube to the A post without cracking the screen then fitting both half's of the snorkel together with flexible pipe.
next I need to feed the tubing from the airbox through and work out a way of fitting the mushroom on the top as there is a difference in diameter of the upright tube and the mushroom.
I want to make a decent job of this bit as it's the bit everyone see's.
Here is a couple of pictures of how far I got today.
http://i1141.photobucket.com/albums/n58 ... oto-23.jpghttp://i1141.photobucket.com/albums/n58 ... oto-24.jpg
I would prefer a full bottle in front of me than a full frontal lobotomy.
Seek not excess, God hates he who roams !